OU Portal
  • Log In
  • Welcome
  • Applicants
Z6_60GI02O0O8IDC0QEJUJ26TJDI4
{}
Zavřít
Publikační činnost


preloading...   Probíhá načítání, čekejte prosím...
publicationId :
tempRecordId :
actionDispatchIndex :
navigationBranch :
pageMode :
tabSelected :
isRivValid :
Typ záznamu * : stať ve sborníku (D)
Domácí pracoviště * : Katedra fyzické geografie a geoekologie (31600)
Název * : Morphological patterns and longitudinal connectivity in Beskydian headwater channels
Citace : Galia, T. a Škarpich, V. Morphological patterns and longitudinal connectivity in Beskydian headwater channels. In: Geomorphological proceedings 12. Ústí nad Labem, Praha: Univerzita Jana Evangelisty Purkyně; Ústav struktury a mechaniky hornin AV ČR, v.v.i., 2014. Univerzita Jana Evangelisty Purkyně; Ústav struktury a mechaniky hornin AV ČR, v.v.i., 2014. s. 24-25. ISBN 978-80-7414-712-8.
Podnázev :
Rok * : 2014
Obor * : Zemský magnetismus, geodesie, geografie
Počet stran * : 2
Strana od * : 24
Strana do * : 25
Forma vydání * : Tištená verze
Kód ISBN * : 978-80-7414-712-8
Kód ISSN :
Název sborníku * : Geomorphological proceedings 12
Sborník :
Název nakladatele * : Univerzita Jana Evangelisty Purkyně; Ústav struktury a mechaniky hornin AV ČR, v.v.i.
Místo vydání * : Ústí nad Labem, Praha
Stát vydání : Sborník vydaný v ČR
Název konference : State of geomorphological research in the year 2014
Místo konání konference * : Teplice v Čechách
Datum zahájení konference * :
Typ akce podle státní
příslušnosti účastníků akce * :
Evropská akce
Kód UT WoS :
EID :
Klíčová slova anglicky * :
Moravskoslezské Beskydy Mts, mountain stream, bedload transport, bed sediments, hillslope-channel coupling
Popis v původním jazyce * :
Mountain headwater streams are the interface between hillslope and ?uvial processes and the suppliers of water and sediment to downstream ?uvial networks (Kavage-Adams, Spotila 2005). Our contribution summarizes investigations in small flysch-based mountain streams of Moravskoslezské Beskydy Mts. Continuity in channel-reach morphologies were assessed in longitudinal stream profiles with respect to intensity of bedload transport and thus, (dis)equilibrium between potential sediment supply and transport capacity during flood events. Parameters of observed channel-reach morphologies were statistically evaluated by PCA analysis to obtain leading predispositing factors. Bedload transport was evaluated by simulations in 1D transport model TOMSED and by observations of marked particle movement (Galia - Hradecký 2012). Moreover, measurements of largest boulders occurred in channels gave information about competence of stream power during flood events to transport this coarsest fraction.
Popis v anglickém jazyce * :
Typ zdroje financování výsledku * : Projekty CEP/Záměry CEZ
Seznam projektů :
ID Projektu Název projektu
Seznam ohlasů : 
Ohlas
R01:

© 2019 Centre for Information Technology

  • Technická podpora :
  • Mgr. Olga Blahutová (phone: +420 597 091 129, phone flap for UO: 1129)
  • Ing. Lucie Svitaneková (phone: +420 597 091 108, phone flap for UO: 1108)
Complementary Content
  • ${title}${badge}
${loading}